聯(lián)系方式:400-990-3999 / 郵箱:sales@xiyashiji.com
西亞試劑 —— 品質(zhì)可靠,值得信賴
【Method of Use】
1. Detach the charge intake cover from the charge valve.
2. Set the cap nut in the connector. Then, mount them in the charge intake.
3. Confirm that the connected side of the connector and the charge intake are normal. Afterwards, tighten the cap nut with the spanner etc. Be careful not to over tighten.
4. Use a commercially available tube fitting suitable for the outside diameter of the pipe connector when connecting to the gas introduction pipe of the reactor.
We have two types of connectors, a tube connector for under ordinary pressure and a pipe connector for under increased pressure. The outside diameter of both connectors is 6.0 mm. Each connector is bundled with a cap nut. Please use both connectors according to the situation.